Infinity IVD Project Equipment Facility
Infinity IVD’s operating project-equipment facility supports project-specific equipment development, assembly, preparation and factory-acceptance readiness.

What is publicly disclosed.
Infinity IVD’s operating project-equipment facility supports project-specific equipment development, assembly, preparation and factory-acceptance readiness.
The project is classified as Project-equipment manufacturing and mobilisation facility. Its public status is Completed, and the published location is Türkiye. Where the disclosed area is available, it is stated as 1,000 m²; this value is not converted into a cleanroom, operating or ownership claim.
Scope is separated by work package.
- Project-specific equipment manufacturing
- Equipment assembly and preparation
- Core equipment-concept development
- Factory-acceptance preparation
- Project mobilisation support
Each item describes the disclosed engagement boundary. It does not imply services outside the listed scope or transfer responsibility from the client, operator, technology owner or competent authority.
Evidence follows the Seven-Gate Framework.
Reference evidence is assessed against investment definition, concept design, engineering, procurement and technology integration, quality readiness, commissioning and operational handover. The applicable gates depend on the contracted work packages. A design-only engagement is not presented as construction; equipment supply is not presented as complete EPC.
Review the Seven-Gate Framework ↗What this page does not claim.
This facility supports project equipment and mobilisation; it is not described as a diagnostic-product manufacturing site.
Certification, accreditation, product registration and market authorisation remain subject to independent competent authorities and the accountable legal entity. Commercial values, restricted drawings, capacities and client documentation are released only where authorised or during qualified due diligence under NDA.
Connect the reference to an investable project scope.
The reference demonstrates a disclosed technical engagement, not a generic promise of identical cost, capacity or schedule elsewhere. A new programme must be sized for destination-market demand, utilities, workforce, regulatory pathway, site conditions and intended operating model.